| 01. |
Name
of the Project |
: |
Improvement
to Larasara M.I.P. |
| 02. |
Name
of the Village |
: |
Larasara |
| 03. |
Name
of the Grampanchayat |
: |
Deogarh |
| 04. |
Name
of the Block |
: |
Maneswar |
| 05. |
Name
of the District |
: |
Sambalpur |
| 06. |
Assembly
Constituency |
: |
Rairakhol |
| 07. |
Catchment
Area |
: |
4.40
sq..Km. |
| 08. |
Design
Ayacut |
: |
121.00
hactress Khariff
20.00 hactress Rabi |
| 09. |
Administrative
Approval Received |
: |
Accorded
for Rs. 47.294 lakhs vide letter no. 792 dt. 11/12/2001 of C.E.O.
W.O.D.C. Bhubaneswar |
| 10. |
Expenditure
Incurred |
: |
40.61
lakhs upto 9/04 |
| 11. |
Additional
Ayacut Achieved |
: |
81.00
hactress in Khariff |
| |
|
|
|
| PRESENT
STATUS |
| A. |
Head
Works |
: |
i.
Raising of earth dam to design section is completed.
ii. Construction of escape work completed.
iii. Re-construction of Head regulator completed.
iv. Toe drain of Earth dam completed |
| B. |
Distribution
System |
: |
Resectioning
of canal alongwith canal lining completed upto 140mt. (Rt. canal). |